Performance

Performance

  • Measurable result
    ~ ISO 14050:2020 Environmental management — Vocabulary
  • Carrying out or execution
    ~ ISO/IEC 21000-5:2004 Information technology — Multimedia framework (MPEG-21) — Part 5: Rights Expression Language
  • Achievements of an activity, a process or an organization
    ~ ISO 50007:2017 Energy services — Guidelines for the assessment and improvement of the energy service to users
  • In the context of an operation, the carrying out of the operation by an object (the performer).
    ~ ISO 23103:2020 Space link extension — Cross support transfer service — Specification framework

Objective

  • Result to be achieved
    Note 1 to entry: An objective can be strategic, tactical, or operational.
    Note 2 to entry: Objectives can relate to different disciplines (such as finance, health and safety, and environment). They can be, for example, organization-wide or specific to a project, product or process.
    Note 3 to entry: An objective can be expressed in other ways, e.g. as an intended result, as a purpose, as an operational criterion, as an AI objective or by the use of other words with similar meaning (e.g. aim, goal, or target).
    Note 4 to entry: In the context of AI management systems, AI objectives are set by the organization, consistent with the AI policy, to achieve specific results.
    ~ ISO/IEC 42001:2023 Information technology — Artificial intelligence — Management system
  • statement of preference about possible and achievable future situations that influences the choices within some behaviour
    ~ ISO 19439:2006 Enterprise integration — Framework for enterprise modelling

Goal

  • Intended outcome
    Note 1 to entry: A goal is stated independently of the functionality used to achieve it.
    ~ ISO 20282-1:2006 Ease of operation of everyday products — Part 1: Design requirements for context of use and user characteristics

Outcome

  • change resulting from the use of the output from a project
    ~ ISO 21502:2020 Project, programme and portfolio management — Guidance on project management
  • Observable result of the successful achievement of the process purpose
    ~ ISO/IEC 24668:2022 Information technology — Artificial intelligence — Process management framework for big data analytics
  • Final result or consequence of the output
    Note 1 to entry: The outputs and outcomes can affect each other through a circular process.
    Output is the end product or service of a process. The outputs and outcomes can affect each other through a circular process.
    ~ ISO 41011:2024 Facility management — Vocabulary

Result

  • An output from performing project management processes and activities. Results include outcomes (e.g., integrated systems, revised process, restructured organization, tests, trained personnel, etc.) and documents (e.g., policies, plans, studies, procedures, specifications, reports, etc.)
    ~ A Guide to the Project Management Body of Knowledge (PMBOK® Guide) — Fifth Edition
  • Determination after having carried out a process
    ~ ISO 22932-1:2020 Mining — Vocabulary — Part 1: Planning and surveying
  • Entity produced by the performance of an operation
    ~ ISO/IEC 2382:2015 Information technology — Vocabulary

Benefit

  • Created advantage, value or other positive effect
    ~ ISO 21500:2021 Project, programme and portfolio management — Context and concepts
  • helpful or good effect, or something intended to help
    ~ ISO 4980:2023 Benefit-risk assessment for sports and recreational facilities, activities and equipment
  • Positive outcome that is voluntarily or involuntarily created by a system or process.
    Note 1 to entry: Benefits correspond to one or more underlying desired values.
    ~ ISO/IEC/IEEE 24748-7000:2022 Systems and software engineering — Life cycle management — Part 7000: Standard model process for addressing ethical concerns during system design

Leave a Reply